Hi
If I change items in my master spreadsheet can i import the sheet in a way where it overwrites existing products rather than creating copies of products that dont have images and mapping.
with the impending vat change, which i have as inclusive in the price. What is the best way to change all my prices?
Bulk edit will take a while and if i import from my master excel spreadsheet (preferable) then i get two of everything in products.